Fully Automatic PVC UPVC Pipe Water Supply Tube Extrusion Line
Video
Technical parameter:
Different models of production lines can produce PVC pipes with different diameter.
ExtruderModle | Pipe diamter(MM) | Production capacity(kg/h) | Production speed(m/min) | Total power(kw/h) |
SJSZ51/105 |
16-63 |
120 |
15 |
45 |
SJSZ55/110 |
50-160 |
180 |
5 |
55 |
SJSZ65/132 |
75-250 |
250 |
4 |
75 |
SJSZ80/156 |
110-315 |
450 |
2 |
105 |
SJSZ92/188 |
315-630 |
600 |
1 |
205 |
SJSZ1051/220 |
500-800 |
1200 |
1 |
305 |
Details Images
1.Conical double screw extruder
- (1) Motor brand: Siemens
- (2) Inverter brand: ABB/Delta
- (3) Contactor brand: Siemens
- (4)Relay brand: Omron
- (5) Breaker brand: Schneider
- (6) Material of screw and barrel: 38CrMoAlA.
- (7) Heating method: Ceramic or cast aluminum heating
2.Mould
- (1)Material: 40GR
- (2)Size: Customizable
- (3)Wall thickness:Providing by customer
- (4)Heating power: 32KW
3.Calibrating and cooling tank
(1)Vacuum pump power : 3 kw*2
(2)Water pump power: 4 kw*2
(3)Spray cooling: ABS nozzle; Stainless steel pipe
(4)Stainless steel material: 1Cr18NiTi
(5)Diameter of tank : Customized
(6)Length of tank: 6 m
4.Haul-off machine
(1) Hauling power: 1.5*4 kw
(2) Clamping style: Pneumatic clamping
(3) Transducer: Siemens transducer
(4) Hauling track type: Plastic block
(5) Effective clamping length:1800 mm
5.Cutting machine
(1)Cutting motor power: 2.2 kw
(2)Cutting scope: Customized
(3)Control means: Pneumatic control
(4)Revolution motor: 1.5KW
(5)Cutting saw: steel alloy
6.Stacker
(1)Length: 6000 mm
(2)Material: Stainless steel
(3)Unloading method: Pneumatic unloading
Product applications:
Workshop:
Product applications:
1.Water supply, drainage pipelines in building;
2.Rainwater drainage pipelines in building;
3.Electrical wiring pipe in building;
4.Air conditioning condensate water systems.
After-sale service
FAQ
1.Are you manufacturer or trading company?
We are manufacturer.
2.Why choose us?
We have 20 years experience for producing machine.We can arrange for you to visit our local customer's factory.
3.Delivery time: 20~30 days.
4.Payment terms:
30% of total amount should be paid by T/T as down payment, the balance (70% of total amount) should be paid before delivery by T/T or irrevocable L/C(at sight).