OEM Manufacturer China Plastic Extruder Door Frame Solid Thick Hollow Board Plate Door Frame PVC PP WPC Making Machine Production Line
Video
The key to our success is "Good Product Excellent, Reasonable Rate and Efficient Service" for OEM Manufacturer China Plastic Extruder Door Frame Solid Thick Hollow Board Plate Door Frame PVC PP WPC Making Machine Production Line, We have confident that we could offer the high quality products and solutions at resonable price tag, superior after-sales support into the shoppers. And we will build a vibrant long run.
The key to our success is "Good Product Excellent, Reasonable Rate and Efficient Service" for China WPC Profile Making Machinery, Double Screw Profile Extruder, With the goal of "zero defect". To care for the environment, and social returns, care employee social responsibility as own duty. We welcome friends from all over the world to visit and guide us so that we can achieve the win-win goal together.
Flow Process
1.PE/PP+wood extrusion line craft:
Wood milling(wood powder,rice husk)-- Mixer(plastic+wood)--Granulator--Wpc extrusion line+Auxiliary
2.PVC+wood extrusion line craft:
Model | Width of Product (mm) | Capacity(kg/h) | Total Power(kw/h) |
SJZ55 | 108 | 150 | 60 |
SJZ65 | 240 | 250 | 90 |
SJZ80 | 300 | 300 | 100 |
SJZ92 | 1000 | 600 | 200 |
SJZ120 | 2000 | 800 | 250 |
Technical parameter:
NO. |
Specification |
Quantity |
1 |
Automatic loading system |
1 set |
2 |
Double screw extruder |
1 set |
3 |
Die head |
1 set |
4 |
Calibrating and cooling device |
1 set |
5 |
Haul-off machine |
1 set |
6 |
Cutting machine |
1 set |
7 |
Stacker |
1 set |
Details Images
1.Conical screw extruder with Automatic loading system
2.Die head
3.Calibrating and cooling device
4. Haul-off machine
5.Cutting machine
6.Stacker
Final product:
After-sale service
FAQ
1.Are you manufacturer or trading company?
We are manufacturer.
2.Why choose us?
We have 20 years experience for producing machine.We can arrange for you to visit our local customer's factory.
3.Delivery time: 20~30 days.
4.Payment terms:
30% of total amount should be paid by T/T as down payment, the balance (70% of total amount) should be paid before delivery by T/T or irrevocable L/C(at sight).