PET corrugated sheet machine
PET Corrugated Sheet Production Line special screw and mould design to make the material form easily with uniform plasticizing, high production speed, stable running and easy operation.
PET Corrugated Sheet production line has the moderate rigidity & strength, good flexibility, creep resistant, environmental stress crack resistance and favorable hot melting property.
The whole production line consists of the following seven parts:
NO. | Name | Quantity |
1 | HH75/40 Parallel screw extruder | 1 set |
2 | Gear pump and T-die | 1 set |
4 | Three-roller calendar | 1 set |
5 | Tempering oven | 1 set |
6 | Corrugated forming machine | 1 set |
7 | Haul off machine | 1 set |
8 | Cutting machine | 1 set |
Details Images
1. PET Corrugated sheet making machine: HH75/40 Parallel screw extruder
(1) Motor: Siemens
(2) Inverter: ABB/Delta
(3) Contactor: Siemens
(4) Relay: Omron
(5) Breaker: Schneider
(6) Heating method: Cast aluminum heating
(7) Material of screw and barrel: 38CrMoAlA.
2.PET Corrugated sheet making machine:Gear pump
(1) Motor power:15kw
(2) Material of Gear pump: high strength steel alloy
3. PET Corrugated sheet making machine: T-die
(1)Product thickness: 0.5-1.2mm
(2)Material of Gear pump: high strength steel alloy
4. PET Corrugated sheet making machine:Three-roller calendar
(1) Roller length: 1300mm
(2) Max. Roller diameter: Ø400mm
(3) Line speed: 2.2 m/min
5. PET Corrugated sheet making machine:Tempering oven
(1) Heating zones: 6zones
(2) Inside width: 1500mm
6.PET Corrugated sheet making machine:Corrugated forming machine
(1)corrugated shaping roller q'ty: 5 pcs
(2)No.1 and No.2 drive motor: 1.5kw
(3)No.3,No.4 and No.5 drive motor:3kw
7.PET Corrugated sheet making machine:Haul off unit
(1) Drive motor: 2.9kw AC servo motor
(3) Roller specification:Ф250×1500mm
8.PET Corrugated sheet making machine:Cutting machine
(1)Motor POWER: 1.1kw
(2)Knife :2pcs
Final product:
After-sale service
FAQ
1.Are you manufacturer or trading company?
We are manufacturer.
2.Why choose us?
We have 20 years experience for producing machine.We can arrange for you to visit our local customer's factory.
3.Delivery time: 20~30 days.
4.Payment terms:
30% of total amount should be paid by T/T as down payment, the balance (70% of total amount) should be paid before delivery by T/T or irrevocable L/C(at sight).