Professional China 160-630mm 3 Layers PPR Water Pipe Tube Plastic Extruder Machine
Video
Model | Screw Diameter(mm) | L/D ratio | Main motor power(kw) |
SJ45/33 | 45 | 33 | 18.5/22/30 |
SJ65/33 | 65 | 33 | 45/75/90 |
SJ75/33 | 75 | 33 | 110/132 |
SJ90/33 | 90 | 33 | 160/185 |
SJ120/33 | 120 | 33 | 280/315 |
SJ150/33 | 150 | 33 | 355/400 |
SJ50/38 | 50 | 38 | 75 |
SJ60/38 | 65 | 38 | 110 |
SJ75/38 | 75 | 38 | 160 |
SJ90/38 | 90 | 38 | 250/280 |
SJ120/38 | 120 | 38 | 315/355 |
SJ150/38 | 150 | 38 | 450 |
Technical parameter:
NO. | Name | Quantity |
1 | Single screw extruder (with automatic feeding system) | 1set |
2 | Mould | 1set |
3 | Vacuum calibrating tank | 1set |
4 | Water cooling tank | 1set |
5 | Haul-off machine | 1set |
6 | Cutting machine | 1set |
7 | Bracket | 1set |
Details Images
1.PPR pipe extrusion line making machine:Single screw extruder
(1) Motor: Siemens
(2) Inverter: ABB/Delta
(3) Contactor: Siemens
(4) Relay: Omron
(5) Breaker: Schneider (6) Heating method: Cast aluminum heating
(7) Material of screw and barrel: 38CrMoAlA.
2.PPR pipe extrusion line making machine:Mold
(1) Material: 40GR
(2) Size: Customized
3.PPR pipe extrusion line making machine:Vacuum calibrating tank
(1) Vacuum pump power : 5.5 kw
(2) Material: Stainless steel
(3) Diameter: Customized
(4) Length: 6 m
4.PPR pipe extrusion line making machine:Water cooling tank
(1) Water pump power: 4 kw
(2) Material: Stainless steel
(3) Method: Enforced spraying
(4) Length of tank: 6 m
5.PPR pipe extrusion line making machine:Haul-off machine
(1) Driving motor power: 2.2 kw
(2) Transducer: Siemens transducer
(3) hauling track type:110 plastic block
(4) Pressing method: Pneumatic pressing
(5) Effective clamping length:1800 mm
6.PPR pipe extrusion line making machine:Cutting machine
(1) Motor power: 3 kw
(2) Method: Saw cutting
(3) Cutting scope: Customized
(4) PLC control system, using meter counter or sensor switch for the setting of desired length.
7.PPR pipe extrusion line making machine:Bracket
(1) Length: 12 m
(2) Material: Stainless steel
(3) Unloading method: Pneumatic unloading
Final product:
After-sale service
FAQ
1.Are you manufacturer or trading company?
We are manufacturer.
2.Why choose us?
We have 20 years experience for producing machine.We can arrange for you to visit our local customer's factory.
3.Delivery time: 20~30 days.
4.Payment terms:
30% of total amount should be paid by T/T as down payment, the balance (70% of total amount) should be paid before delivery by T/T or irrevocable L/C(at sight).